BI PV Project Summary |  © Telefonica, 2006 | |  | | Name project | PV Canopy in Telefonica "C District" | | Country | Spain | | Year | 2006-09-01 (Start operation date) | | PV application | Flat roof - mounted & mechanical fixing | | PV power total | 2874 kWp | | Location | Madrid, Madrid | | Latitude/Longitude | 40°20'53"N 3°43'23"W | | Summary | PV plant of 2,9 MWp integrated in the canopy of the new headquarters of Telefonica company (called "C District") in Madrid. The PV modules, which occupy more than 21000 m2 are distributed in such a way that they form the letter "C" that constitutes the name of the building ensamble. The PV plant is divided into 24 independent 100 kW PV plants, connected to the distribution grid through 5 Transformation Centers of 630 kVA each. | | Keywords | (bipv) building integrated pv |
|